Traffic Bridges - Cudal and Cargo

Share Traffic Bridges - Cudal and Cargo on Facebook Share Traffic Bridges - Cudal and Cargo on X (formerly Twitter) Share Traffic Bridges - Cudal and Cargo on Linkedin Email Traffic Bridges - Cudal and Cargo link

Edward Street Bridge, Cudal

Following significant flooding events in 2022, Cabonne Council undertook assessments of affected infrastructure and identified that the road culvert crossing to Dean Park along Edward Street had sustained structural damage, including cracking and separation of the deck.

In addition to this damage, the crossing and its surrounding drainage infrastructure have required upgrades to improve performance, particularly during periods of heavy rainfall when water flow and capacity can impact access. As a result, the site has been prioritised for improvements to enhance drainage efficiency and overall resilience.

Council is now progressing works to upgrade the Edward Street crossing, with a focus on increasing culvert capacity and improving water flow through the area. These improvements are designed to reduce the impact of high-water levels on the road network and help ensure more reliable access for the community.

To maintain access during construction, a temporary side bridge will be installed following community engagement, ensuring local residents can continue to access their properties.

The project forms part of a broader program of infrastructure upgrades across the Cabonne local government area and is funded through the Regional Transport Resilience Fund, jointly supported by the Australian and New South Wales Governments under the Disaster Recovery Funding Arrangements.

Baghdad Road Bridge, Cargo

As part of the same funding program, the Baghdad Road Bridge in Cargo has also been identified for replacement to improve safety, functionality and long-term resilience.

The Baghdad Road Bridge is a timber structure located approximately six kilometres from Cargo, crossing Canomodine Creek. It plays an important role in supporting local transport, including access for residents, agricultural operations and regional travel.

The bridge sustained extensive structural damage during recent flooding, impacting its safety and long-term reliability. It will be fully replaced as part of Council’s infrastructure recovery and resilience program.

The new bridge will be constructed using reinforced concrete, providing a stronger and more durable structure with an extended service life. This upgrade will improve safety, increase load capacity and ensure the crossing is better able to withstand future weather events and environmental conditions.


Edward Street Bridge, Cudal

Following significant flooding events in 2022, Cabonne Council undertook assessments of affected infrastructure and identified that the road culvert crossing to Dean Park along Edward Street had sustained structural damage, including cracking and separation of the deck.

In addition to this damage, the crossing and its surrounding drainage infrastructure have required upgrades to improve performance, particularly during periods of heavy rainfall when water flow and capacity can impact access. As a result, the site has been prioritised for improvements to enhance drainage efficiency and overall resilience.

Council is now progressing works to upgrade the Edward Street crossing, with a focus on increasing culvert capacity and improving water flow through the area. These improvements are designed to reduce the impact of high-water levels on the road network and help ensure more reliable access for the community.

To maintain access during construction, a temporary side bridge will be installed following community engagement, ensuring local residents can continue to access their properties.

The project forms part of a broader program of infrastructure upgrades across the Cabonne local government area and is funded through the Regional Transport Resilience Fund, jointly supported by the Australian and New South Wales Governments under the Disaster Recovery Funding Arrangements.

Baghdad Road Bridge, Cargo

As part of the same funding program, the Baghdad Road Bridge in Cargo has also been identified for replacement to improve safety, functionality and long-term resilience.

The Baghdad Road Bridge is a timber structure located approximately six kilometres from Cargo, crossing Canomodine Creek. It plays an important role in supporting local transport, including access for residents, agricultural operations and regional travel.

The bridge sustained extensive structural damage during recent flooding, impacting its safety and long-term reliability. It will be fully replaced as part of Council’s infrastructure recovery and resilience program.

The new bridge will be constructed using reinforced concrete, providing a stronger and more durable structure with an extended service life. This upgrade will improve safety, increase load capacity and ensure the crossing is better able to withstand future weather events and environmental conditions.


  • Update September 2026

    Share Update September 2026 on Facebook Share Update September 2026 on X (formerly Twitter) Share Update September 2026 on Linkedin Email Update September 2026 link

    Council is progressing plans for the replacement of the Edward Street Bridge, which has been identified as a priority project. Contractors are currently aiming to mobilise to site in the week commencing 26 October.

    To minimise disruption for residents, the existing causeway at Edward Street will remain open throughout construction. While the available width will be slightly reduced, access will be maintained at all times. Council is currently preparing notification letters for residents and local schools.

    Construction of the Edward Street Bridge is expected to take approximately three months, with the goal of completing works before Christmas or shortly after.

    Once completed, the contractor will move to the Baghdad Road Bridge project in Cargo, which is anticipated to commence in mid to late January.

    Similar arrangements will be in place for Baghdad Road, with the existing access remaining available during construction, although it may be slightly narrower. Access for residents will be maintained at all times. The Baghdad Road Bridge replacement is also expected to take approximately three months to complete.

    Council is progressing plans for the replacement of the Edward Street Bridge, which has been identified as a priority project. Contractors are currently aiming to mobilise to site in the week commencing 26 October.

    To minimise disruption for residents, the existing causeway at Edward Street will remain open throughout construction. While the available width will be slightly reduced, access will be maintained at all times. Council is currently preparing notification letters for residents and local schools.

    Construction of the Edward Street Bridge is expected to take approximately three months, with the goal of completing works before Christmas or shortly after.

    Once completed, the contractor will move to the Baghdad Road Bridge project in Cargo, which is anticipated to commence in mid to late January.

    Similar arrangements will be in place for Baghdad Road, with the existing access remaining available during construction, although it may be slightly narrower. Access for residents will be maintained at all times. The Baghdad Road Bridge replacement is also expected to take approximately three months to complete.

  • Update August 2026

    Share Update August 2026 on Facebook Share Update August 2026 on X (formerly Twitter) Share Update August 2026 on Linkedin Email Update August 2026 link

    At the Ordinary Council Meeting held on 28 July, Council awarded tenders for the Baghdad Road and Edward Street Road bridge projects. Both contracts were awarded to a single tenderer following the resolution of Council.

    At the Ordinary Council Meeting held on 28 July, Council awarded tenders for the Baghdad Road and Edward Street Road bridge projects. Both contracts were awarded to a single tenderer following the resolution of Council.

  • Update June 2026

    Share Update June 2026 on Facebook Share Update June 2026 on X (formerly Twitter) Share Update June 2026 on Linkedin Email Update June 2026 link

    The tender for the design and construction of both bridges has now been released, with outcomes expected to be reported to the July 2026 Ordinary Council meeting.

    The tender for the design and construction of both bridges has now been released, with outcomes expected to be reported to the July 2026 Ordinary Council meeting.

Page last updated: 17 Sep 2026, 11:16 AM